JXF吉祥坊


The 6.0mt/a lignite dry coal preparation plant of Yushujing coal mine of Shanghaimiao mining company was put into operation in March 2018, replacing the original complex water washing process of heavy medium shallow tank, heavy medium cyclone, spiral chute, final clean coal drying and slime drying. All raw coal is crushed to less than 80mm and put into dry coal preparation system, which solves the problem that slimy coal cannot be sorted.

The project is constructed and operated by Tangshan Shenzhou manufacturing group. It makes full use of the original coal flow system and adopts modular layout and personalized design. Since it was put into operation, the operation has been stable and reliable, creating good economic benefits for the mine.


ITEM

yield Wt%

ASH Ad%

sulfur Std%

Qnet,ar,Kcal/kg   NET CALORIFIC VALUE Qnet,ar,Kcal/kg 

RAW COAL

100

43.32

1.87

2621

LUMP CLEAN COAL

10.52

15.84

1.09

4010

FINE CLEAN COAL

52.96

24.97

1.18

3628

REJECT

36.52

77.86

3.10

761

YUSHUJING COAL MINE OF SHANGHAIMIAO MINING COMPANY OF LINKUANG GROUP OF SHANDONG ENERGY GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT, 
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE